unitech Nirvana Country
Its time to put your feet up, to breathe some fresh air, to enjoy the luxury of space...
Sector - 50, Gurgaon

Yes,I am interested to know more about Gurgaon Nirvana Country. Please get in touch with me.

* Name
* Email
* Mobile No.
* Comments

Nirvana Country - Overview

Its time to put your feet up, to breathe some fresh air, to enjoy the luxury of space, to lie in the lap of nature and be completely stress-free.
Go Top

Nirvana Country - Features

  • Lounge/ Hall
  • The Children's Room
  • Indoor Games Room
  • Spend quality time with your family accompanied by great food at theRestaurant.
  •  Enjoy a relaxing swim at the pool.
  • Work out and get in shape at the fully equipped Gymnasium.
  • Tennis court and Squash court
Features Nirvana Country
Go Top

Nirvana Country - Specifications

Wall Finish
Internal Oil bound distemper
External Combination of Marble/Sandstone grit/stone
Servant Room / Study Oil bound distemper
 
Flooring
Living / Dining Vitrified tiles
Bed Rooms Vitrified tiles
Stair Case Marble
Servant Room / Study Ceramic tiles
Kitchen
Flooring Ceramic tiles
Dado Ceramic tiles 600 above counter
Platform Granite counter with stainless steel sink, drain board with C.P. fittings
 
Toilets
Flooring Ceramic tiles
Dado Select ceramic tiles upto 2100 mm above floor
Counter Marble
Fixtures White Chinaware
Fittings Single lever C.P. fittings
 
Doors
Internal Seasoned hardwood frames with European style moulded shutters
Main Entry Seasoned hardwood frames with European style moulded shutters
External Powder coated / anodized aluminium
 
Windows
Powder coated / anodized aluminum with M.S. grill

Electrical
Copper wiring in concealed conduits modular moulded switches and MCBs

Power back-up
24x7 power back-up

Go Top

Nirvana Country - Floor Plans

Type 1

 
Floor Plans Ground Floor :	425.550 sq. mt. (4580.58 sq. ft.) Floor Plans First Floor :	425.550 sq. mt. (4580.58 sq. ft.)
Ground Floor : 425.550 sq. mt. (4580.58 sq. ft.) First Floor : 425.550 sq. mt. (4580.58 sq. ft.)
   
Floor Plans Second Floor :	425.550 sq. mt. (1835 sq. ft.)  
Second Floor : 425.550 sq. mt. (1835 sq. ft.)  
Type 2  
Floor Plans Ground Floor :	300.00 sq. mt. (3229.2 sq. ft.) Floor Plans First Floor :	300.00 sq. mt. (1540 sq. ft.)
Ground Floor : 300.00 sq. mt. (3229.2 sq. ft.) First Floor : 300.00 sq. mt. (1540 sq. ft.)
   
Floor Plans Second Floor :	300.00 sq. mt. (338 sq. ft.)  
Second Floor : 300.00 sq. mt. (338 sq. ft.)  
Type 3  
Floor Plans Ground Floor :	200.00 sq. mt. (2158.8 sq. ft.) Floor Plans First Floor :	200.00 sq. mt. (2158.8 sq. ft.)
Ground Floor : 200.00 sq. mt. (2158.8 sq. ft.) First Floor : 200.00 sq. mt. (2158.8 sq. ft.)
   
Floor Plans Second Floor :	200.00 sq. mt. (2158.8 sq. ft.)  
Second Floor : 200.00 sq. mt. (2158.8 sq. ft.)  
Type 4  
Floor Plans Ground Floor :	160.00 sq. mt. (1722.2 sq. ft.) Floor Plans First Floor :	160.00 sq. mt. (1722.2 sq. ft.)
Ground Floor : 160.00 sq. mt. (1722.2 sq. ft.) First Floor : 160.00 sq. mt. (1722.2 sq. ft.)
   
Floor Plans Second Floor :	160.00 sq. mt. (1722.2 sq. ft.)  
Second Floor : 160.00 sq. mt. (1722.2 sq. ft.)  

Go Top

Nirvana Country - Price List

Basic Sale Price of the Floors (BSP)
Plot size>> 160 sq. mtr
200 sq. mtr. 300 sq. mtr. 425.55 sq. mtr#
Saleable Area (sq.ft.)>> 942 1158 1624  
Floor        
Ground Floor Rs. 4400000 Rs. 5500000 Rs. 7300000 Rs. 10300000
First Floor Rs. 3800000 Rs. 4800000 Rs. 6300000 Rs. 8700000
Second Floor Rs. 3500000 Rs. 4400000 Rs. 5800000 Rs. 7550000
Preferential Location Charges#(PLC)
(for each PLC)
Rs. 175000 Rs. 250000 Rs. 350000 Rs. 500000
Interest Free Maintenance Security (IFMS) Rs. 35/- per sq. yard of the area of the plot
(To be paid by each Floor allottee)
Club Membership Registration Charges (CMRC) (Mandatory) Rs. 75,000/-

Saleable Area for Ground Floor and First Floor shall be 2296 sq. ft. and for Second Floor Salable Area shall be 1835. Second Floor shall also have terrace Area of 443 sq. ft.
  • Prices mentioned above are escalation free and are Inclusive of External Development Charges (EDC) paid at present rates. Any revision by the Authorities in the same shall be paid by the allottees on pro-rata basis.
  • Basic Sale Price for Ground Floor Unit of 300 sq. mtr. and 508.96 sq. mtr. plots is inclusive of 2 (two) open car parking spaces whereas Basic Sale Price of other Floors is inclusive of only one open car parking space.
  • The Company would pay to the Allottee(s) Rs.4/- per sq. ft. per month of Saleable Area of the Floor for any delay in offering possession of the Floor beyond the period stipulated in Agreement to Sell. Similarly, the Allottee(s) would also be liable to pay holding charges @ Rs. 4/- per sq. ft. per month of Saleable Area of the Floor if the allottee(s) fails to take possession of the Floor within 21 days from the date of issuance of Possession Letter issued upon clearance of dues or fails to clear his final dues within 30 days of issuance of notice of possession.
  • The Maintenance Charges as determined by the Company at the time of offer of possession of the Floor on the basis of Saleable Area of the Floor for a period of three years shall be payable in advance before the Possession of the Floor is handed over to the Allottee(s).
  • The above Prices/Payment Plans are subject to revision/withdrawal at any time without notice at the sole discretion of the Company.

# PLC- Corner and/or Park facing

Note: Service Tax shall be payable extra by the Allottee(s) as and when applicable.

Go Top

Nirvana Country - Payemnt Plan

Down Payment Plan
Rebate @ 9% of Basic Sale Price  
At the time of Booking/Registration 10% of BSP
Within 45 Days Of Booking/Registration 85% of BSP+ PLC +CMRC
On Final Notice Of Possession 5% of BSP + Stamp duty charges and other charges as applicable
   
Construction Linked Installment Plan
At the time of Booking/Registration 10% of BSP
Within 2 months of Booking/Registration 10% of BSP
Within 4 months of Booking/Registration 10% of BSP
On commencement of construction# 10% of BSP + 50% of CMRC
On completion of foundation work 7.5% of BSP + 50% of PLC
On casting of Ground Floor Roof 7.5% of BSP + 50% of PLC
On casting of First Floor Roof 7.5% of BSP
On casting of Second Floor Roof 7.5% of BSP
On completion of brick work and internal plastering : 5% of BSP
On completion of flooring (except final grinding and plastering) 5% of BSP
On completion of internal electrification 5% of BSP
On completion of internal plumbing 5% of BSP
On completion of External plastering 5% of BSP
On final notice of possession 5% of BSP + 50% of CMRC + Stamp duty charges and any other charges as applicable
   
Other Charges include Interest Free Maintenance Deposit, Common Maintenance Charges, Club Membership
Registration Charges etc.

# These installments and installments below shall become payable on demand irrespective of the serial order in which they are listed below
• BSP – Basic Sale Price
• PLC – Preferential Location Charges
• CMRC – Club Membership Registration Charges
 

Nirvana Country - Site Plan

Site Plan Nirvana Country Gurgaon
Go Top

Nirvana Country - Location Map


View Nirvana Country on Google Map

Nirvana Country Gurgaon Location Map
Go Top

Nirvana Country - Downloads

PDFE-Brochure (size: 3.20 MB)

OTHER PROJECTS

South Park Gurgaon
Espace Premiere Gurgaon
Exquisite Gurgaon
Harmony Gurgaon
Fresco Gurgaon
Uniworld Gardens 2 Gurgaon
Vistas Gurgaon
SunBreeze Gurgaon

Alder Grove Gurgaon
Nirvana Country Gurgaon Independent Floors
Escape Gurgaon
Anthea Floors Gurgaon
Crestview Apartments Gurgaon
The Residences Noida
Uni Homes Noida

Uniworld Gardens Noida
Uni Homes Noida
Unitech Exquisite Noida
Habitat Greater Noida
Unitech Verve Greater Noida
Horizon Greater Noida
Cascades Greater Noida
Gardens Mohali
Executive Floors Mohali
Aspen Greens Mohali
Uni Homes Chennai
Gardens Chennai
Palm Villas Chennai
Aspen Greens Chennai
Birch Court Chennai
Ekanta Chennai

Chaitanya Chennai
Greenwood City Chennai
Palm Premiere Chennai
Uni Homes Bhopal
Fresco Bhopal
Harmony Kolkata
Uni Homes Ambala
Ananda Ambala
Uni Homes Rewari
Ananda Rewari
Uni World Resort Bengaluru
The Residences Dehradun